Aerial Mapping

  • METRO I-710 Corridor Project EIR/EIS Engineering/Environmental Component

    WES was contracted to perform field surveys and right-of-way engineering services for the heavily developed alignment. The prime contractor and their team of engineers and technicians were engaged to complete a major corridor study of the I-710/Long Beach Freeway. This study analyzed traffic congestion and other mobility problems in this corridor and assisted in the […]

  • Metro Project Administration and Environmental Documentation Support for State Route (SR) -138

    Wagner Engineering & Survey, Inc. (WES) performed Land Surveying services on SR-138 between I-5 and SR-14. WES performed research through Metro, Caltrans and Los Angeles County records to include monumentation established by Corner Records, centerline tie notes, records of survey, parcel maps and tract maps as well as Caltrans right-of-way maps and other records. WES […]