Transportation Corridors

  • METRO I-710 Corridor Project EIR/EIS Engineering/Environmental Component

      WES was contracted to perform field surveys and right-of-way engineering services for the heavily developed alignment. The prime contractor and their team of engineers and technicians were engaged to complete a major corridor study of the I-710/Long Beach Freeway. This study analyzed traffic congestion and other mobility problems in this corridor and assisted in […]

  • City of Thousand Oaks Route 101/23 Interchange Improvements Project

    The following tasks were performed: Aerial Surveys and Mapping – WES set the aerial control panels, provided horizontal and vertical control utilizing GPS rapid static methods. The coordinates were tied to the CALTRANS control. WES produced Planimetric mapping at subscribed intervals. Deliverables were digital base mapping and digital orthophotography mapping. Design Topographic Surveys – WES […]